How Much Does an Inground Pool Cost in Marco Island, FL? (2026)

A typical new pool here is $55,000, with a typical range of $42,000–$79,000 — a planning range, not a quote.

It excludes decking, a screen enclosure, and optional upgrades. A Marco Island project still depends on your property layout, access, and selected features.

Question 1 of 138%

Where

Where's the pool going?

Enter street, city, and ZIP. ZIP sets the market price.

Keep answering to unlock your total

Jump: calculator · nearby cities · related Q&A · statewide calculator

What a complete quote should include

Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).

Local permit snapshot

Typical declared value from City of Marco Island: $55,000 (middle half $42,000–$79,000; sample size 62; filed or issued May 11, 2026 through November 11, 2026; checked November 2026). Declared permit values are a floor, not a contract price.

Office capture: sample size 73; median $50,000 (IQR $42,000–$78,000; 71 valued); date window May 11, 2026 to Nov 11, 2026; fee source status: sourced; last checked 2026-11.

Jurisdiction note: City of Marco Island issues permits. County: Collier County.

Marco Island pool permit data, May–November 2026

City of Marco Island

City of Marco Island permit records show at least 73 new residential in-ground pool permits filed or issued from May 11 to November 11, 2026 (City of Marco Island permit records, checked November 2026).

Typical time from application to permit issue: 34 days (median of 54 issued permits; pending permits not counted).

Partial source: the portal's keyword search is capped, so treat the count as a minimum.

Source: City of Marco Island permit portal

Permit fees

$498 (includes electric) — City of Marco Island - Building Services

Res. 26-26.

Source: published fee schedule

Amount included in calculator totals when this market is selected: $498.

Marco Island permits and your property

Marco Island is its own city, so pool permits go through the City of Marco Island, not Collier County (City portal). For screen enclosures, see the City's Screen Enclosure permit application.

Island lots, seawalls, and the beach

On a canal or bay lot, ask Building Services to confirm seawall setbacks and easements using your current survey. Gulf-front lots may also need a state coastal permit (see local facts). Plan the screen for Gulf wind and price it as its own line.

Pool cage / screen enclosure in Marco Island

A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.

Compare written bids

Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.

How the pool permit process usually starts in Marco Island

  1. Start with the City's online portal.
  2. Permit the screen enclosure separately (application page).
  3. Verify a license.
  4. Check whether the lot is seaward of the state Coastal Construction Control Line before design.

Marco Island pool planning: local facts

Nearby pool cost guides

Full index: pool costs by city.

FAQ

Who issues permits for a Marco Island pool?
Marco Island is its own city, so pool permits go through the City of Marco Island, not Collier County (City portal). For screen enclosures, see the City's Screen Enclosure permit application.
Does the pool range include a screen enclosure?
No. These pool permits don't list a screen enclosure. The screen enclosure is priced on its own line.
Does a beachfront Marco Island pool need a state permit?
Construction seaward of the Coastal Construction Control Line needs Florida DEP approval. DEP has a general-permit rule for swimming pools at single-family homes (Rule 62B-34.060). Locate the CCCL.
Is the calculator a quote?
No. It is the typical declared value (the value on the permit, not a contract price) on City of Marco Island permit records, a floor and not a quote. The firm price is in writing after a builder's free visit.