How Much Does a Pool Cost in Jacksonville, FL? (2026)

A typical new pool here is $82,500, with a typical range of $56,100–$107,700 — a planning range, not a quote.

It excludes decking, a screen enclosure, and optional upgrades. A Jacksonville project still depends on your property layout, access, and selected features.

Partial: exported by hand from the office portal; count is a minimum.

Question 1 of 138%

Where

Where's the pool going?

Enter street, city, and ZIP. ZIP sets the market price.

Keep answering to unlock your total

Jump: calculator · nearby cities · related Q&A · statewide calculator

What a complete quote should include

Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).

Local permit snapshot

Typical declared value from City of Jacksonville / Duval County (consolidated): $82,500 (middle half $56,100–$107,700; sample size 42; filed or issued May 11, 2026 through November 11, 2026; checked November 2026). Declared permit values are a floor, not a contract price.

Fee source status: sourced. Last checked: see the series checked label above.

Jurisdiction note: City of Jacksonville Building Inspection Division. County: Duval County.

Jacksonville / Duval permit values, May–November 2026

City of Jacksonville / Duval County (consolidated)

City of Jacksonville / Duval County (consolidated) permit records show a typical declared value (the value on the permit, not a contract price) of $82,500 on new in-ground pool permits filed or issued May 11 through November 11, 2026. The middle half (typical range) ran $56,100–$107,700 (42 valued permits).

This capture is partial: it was exported by hand from the office portal, and the count is a minimum.

Source: JaxEPICS

Checked November 2026.

Permit fees

Formula: per 1,000 gallons of pool capacity — City of Jacksonville - Building Inspection Division

For each 1,000 gallons of capacity: BID permit fee $1.50, resource management fee $0.50, development services fee $0.50; landscape fee 12% of the BID permit fee; C&D debris fee $25.00; minimum BID permit fee $45.00; building plan review 67% of the BID permit fee or $60.00.

Source: published fee schedule

This office publishes a formula, itemized fees, or no single dollar amount, so the fee is not added into the calculator total.

Jacksonville permits and your property

The City of Jacksonville's Building Inspection Division reviews 1- and 2-family in-ground pools. Each pool or spa needs its own building permit, filed online in JaxEPICS (Swimming Pool/Spa checklist). Confirm your parcel's jurisdiction before you apply.

Septic, sewer and special review areas

The City's checklist says a lot on septic needs Health Department approval or a stamp on the survey or site plan, and a lot on City sewer needs a current JEA bill uploaded. Historic properties need a Certificate of Appropriateness, and lots flagged as ASH sites on the JaxEPICS Agency tab need ASH Site Approval (checklist).

Pool cage / screen enclosure in Jacksonville

A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.

Compare written bids

Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.

How the pool permit process usually starts in Jacksonville

  1. Apply in JaxEPICS with a detailed description, an accurate job cost, total gallons, pool type, and water and sewer type (checklist).
  2. Upload the enlarged site-specific pool plan, sealed structural plans, equipment data sheets, the signed TDH worksheet and the Private Swimming Pool Safety Affirmation in the named folders.
  3. If the job costs more than $5,000, record a Notice of Commencement and email it to BIDDocuments@coj.net. It must arrive before you schedule an inspection.
  4. Verify a license.

Jacksonville pool planning: local facts

Nearby pool cost guides

Full index: pool costs by city.

FAQ

Who issues permits for a Jacksonville pool?
The City of Jacksonville's Building Inspection Division reviews 1- and 2-family in-ground pools. Each pool or spa needs its own building permit, filed online in JaxEPICS (Swimming Pool/Spa checklist). Confirm your parcel's jurisdiction before you apply.
Does the pool range include a screen enclosure?
Where the records describe the work, permits that list a screen enclosure are left out of the pool figure. The screen enclosure is priced on its own line.
Do feature walls need engineering in Jacksonville?
Yes, if they're tall. The City's checklist says to submit engineering for a feature wall more than 3 feet high (checklist).
How much is a custom pool in Jacksonville?
Permit records do not label jobs as "custom" or "production." The typical declared value (the value on the permit, not a contract price) on the 42 valued Jacksonville / Duval permits we captured is $82,500, and the middle half ran $56,100–$107,700. A larger or more custom project can sit above that typical range. These figures are a planning floor, not a quote. The firm price is in a written bid after a builder walks the yard.
How much does a pool cost in Jacksonville?
The typical declared value on City of Jacksonville / Duval County (consolidated) new in-ground pool permits, filed or issued May 11 through November 11, 2026, is $82,500 (typical range $56,100–$107,700, 42 valued permits, a partial capture and a minimum count). That is the value on the permit, not a contract price and not a quote.
Is the calculator a quote?
No. It is the typical declared value (the value on the permit, not a contract price) on City of Jacksonville / Duval County (consolidated) permit records we captured, a floor and not a quote. The sample is partial (42 valued permits; the count is a minimum). The firm price is in writing after a builder's free visit.