How Much Does an Inground Pool Cost in Estero, FL? (2026)

A typical new pool here is $71,000, with a typical range of $35,000–$95,000 — a planning range, not a quote.

It excludes decking, a screen enclosure, and optional upgrades. A Estero project still depends on your property layout, access, and selected features.

Estero permits through the Village of Estero, which publishes no permit values we could use, so this is the unincorporated Lee County figure, not a Village of Estero figure.

Question 1 of 138%

Where

Where's the pool going?

Enter street, city, and ZIP. ZIP sets the market price.

Keep answering to unlock your total

Jump: calculator · nearby cities · related Q&A · statewide calculator

What a complete quote should include

Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).

Local permit snapshot

Typical declared value from Lee County (unincorporated): $71,000 (middle half $35,000–$95,000; sample size 2,110; issued January 1, 2025 through November 10, 2026; checked November 2026). Declared permit values are a floor, not a contract price.

Fee source status: sourced. Last checked: see the series checked label above.

Jurisdiction note: Village of Estero issues permits. County: Lee County.

Permit fees

$600 — Village of Estero - Community Development (Building)

Res. 2026-13, Exhibit A.

Source: published fee schedule

Amount included in calculator totals when this market is selected: $600.

Estero permits and your property

For parcels inside the Village of Estero, the Village's Building & Permitting Services handles residential building permits, not Lee County (Community Development). Start with the Village's Building Department and Permitting Services page. Addresses outside the Village go to Lee County.

HOA review, drainage, and access

Many Estero homes are in planned communities, so ask your HOA about its review before you sign. Ask Village permitting staff to confirm setbacks and easements using your current survey, and get side-yard access and hauling covered in a written bid.

Pool cage / screen enclosure in Estero

A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.

Compare written bids

Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.

How the pool permit process usually starts in Estero

  1. Check the application checklist on the Village's permitting page.
  2. The applicant can be a licensed contractor or an owner-builder; verify a license.
  3. The same page says the Village now files Notices of Commencement for projects in the Village.
  4. Schedule inspections through the Village's permitting contacts on that page.

Estero pool planning: local facts

Nearby pool cost guides

Full index: pool costs by city.

FAQ

Who issues permits for a Estero pool?
For parcels inside the Village of Estero, the Village's Building & Permitting Services handles residential building permits, not Lee County (Community Development). Start with the Village's Building Department and Permitting Services page. Addresses outside the Village go to Lee County.
Does the pool range include a screen enclosure?
No. These pool permits don't list a screen enclosure. The screen enclosure is priced on its own line.
Does the Village or Lee County review my pool?
Inside Village limits, the Village of Estero does (Community Development). Outside them, Lee County does.
Is the calculator a quote?
No. It is the typical declared value (the value on the permit, not a contract price) on Lee County (unincorporated) permit records, which this page uses for Estero, a floor and not a quote. The firm price is in writing after a builder's free visit.