How Much Does an Inground Pool Cost in Clewiston, FL? (2026)
A typical new pool here is $70,000, with a typical range of $50,000–$98,000 — a planning range, not a quote.
It excludes decking, a screen enclosure, and optional upgrades. A Clewiston project still depends on your property layout, access, and selected features.
The City of Clewiston and Hendry County have no public permit search we could use.
Where
Where's the pool going?
Enter street, city, and ZIP. ZIP sets the market price.
Jump: calculator · nearby cities · related Q&A · statewide calculator
What a complete quote should include
- Excavation
- Shell and interior finish
- Decking
- Screen enclosure
- Pump and filter equipment
- Electrical work
- Permits and inspections
- Cleanup
Calculator sizes are 12×24 (small lot), 14×28 (smaller yard), 16×32 (our most popular), 18×36 (room for a shelf and laps), and 20×40 (big yard).
Local permit snapshot
Typical declared value from Florida statewide (all permit offices we captured, combined): $70,000 (middle half $50,000–$98,000; sample size 10,317; filed or issued May 11, 2026 through November 11, 2026; checked November 2026). Declared permit values are a floor, not a contract price.
Fee source status: sourced. Last checked: see the series checked label above.
Jurisdiction note: City of Clewiston issues permits inside city limits. County: Hendry & Glades Counties.
Permit fees
Pool valued at $45.00 per sq ft of water surface; fee $65 base plus $4 per $1,000 of valuation up to $149,999. — City of Clewiston - Building
Code App. A, Sec. 3 and 4; Ord. 2016-09.
Source: published fee schedule
This office publishes a formula, itemized fees, or no single dollar amount, so the fee is not added into the calculator total.
Clewiston permits and your property
Inside city limits, the City of Clewiston Community Development Department takes permit applications through its GovWell Citizen Portal (Community Development). Outside city limits, check with Hendry County Building & Licensing.
Lake Okeechobee and elevation
Ask staff to confirm the flood zone and elevation for your lot before you design. The City posts elevation certificates for many addresses on its Floodplain page.
Pool cage / screen enclosure in Clewiston
A screen enclosure is a separate permit from the pool. Declared values (the value on the permit, not a contract price) for new screen-enclosure permits are in the table above. Ask each bidder to identify enclosure scope separately, and confirm placement with the permitting office and the current survey.
Compare written bids
Compare the same pool size, finish, equipment, deck, enclosure, permits, electrical work, startup, and exclusions. Ask who will submit the permit and what site work is excluded. Before signing, use the Florida DBPR Verify a License lookup to check the contractor’s current record and confirm the business name matches the contract.
How the pool permit process usually starts in Clewiston
- Apply in the City's GovWell portal (Community Development).
- Upload documents and pay fees in the same portal.
- Verify a license.
Clewiston pool planning: local facts
- The City publishes elevation certificates for individual addresses on its Floodplain page.
- The City keeps a Herbert Hoover Dike page with guidance for residents around Lake Okeechobee in the unlikely event of a dike breach.
- Clewiston Utilities bills a monthly power adjustment for what it pays to buy electricity (Billing & Payments), so check current bills when you estimate pump costs.
Nearby pool cost guides
Full index: pool costs by city.
FAQ
- Who issues permits for a Clewiston pool?
- Inside city limits, the City of Clewiston Community Development Department takes permit applications through its GovWell Citizen Portal (Community Development). Outside city limits, check with Hendry County Building & Licensing.
- Does the pool range include a screen enclosure?
- Where the records describe the work, permits that list a screen enclosure are left out of the pool figure. The screen enclosure is priced on its own line.
- Who provides electricity in Clewiston?
- The City's own Clewiston Utilities bills electric service. Its billing page explains the base rate and the monthly power adjustment (Billing & Payments).
- Is the calculator a quote?
- No. No usable local permit data was available for Clewiston, so it is the Florida-wide median declared value (the value on the permit, not a contract price) of the permits we captured, a floor and not a quote. The firm price is in writing after a builder's free visit.